Microcement in Horsham
RH12 · RH13 · A24 / A264 · 1 hour from London via the M23 and A24
Microcement is a 2–3 mm mineral coating applied over prepared substrate — no grout lines, no tile joints, effectively seamless across floors, walls and wet-rooms. It's the most versatile finish in our catalogue. Across the RH12, RH13 postcode districts, Horsham projects centre on the interwar detached homes that make up much of the housing stock here. Our typical client here is a homeowner with a family — programmes are planned around the school holidays and daily household use. Horsham sits on the A24 / A264, 1 hour from london via the m23 and a24. From here we cover Billingshurst (6.5 mi) and Cranleigh (9 mi) and out to Crawley (8.5 mi) inside our standard service radius. Microcement wet-rooms and bathrooms come through regularly.
- Own-team applicators — no subcontractors on your job.
- 10-year materials + workmanship warranty on qualifying installs.
- Direct-line to a senior applicator throughout the programme.
- Free Horsham site surveys within 5 working days.
We cover Horsham and all surrounding areas within a practical service radius, including Cranleigh (9 mi), Crawley (8.5 mi), Billingshurst (6.5 mi). Larger projects sit us on-site for the duration rather than commuting daily.
- 1930s detached
- edwardian villa
- listed farmhouse
We survey Horsham projects within 5 working days of enquiry.
- homeowner family
- 1Site survey
Free on-site visit within Horsham. We assess the substrate, take measurements, discuss finishes and confirm what's realistic.
- 2Sample & spec
Sample board delivered — matched to your interior. Written specification and quote turned around within 3 working days.
- 3Programme
Programme agreed with you (and your designer/architect if relevant). Typical Horsham start window is 4–6 weeks.
- 4Application
On-site work delivered by our own trained applicators. Dust-sheeting, waste management and daily tidy included.
- 5Aftercare
Handover pack with batch numbers and aftercare instructions. 10-year materials and workmanship warranty on qualifying installs.
- → microcement bathroom
- → high end paint
- → limewash heritage
How long does a typical microcement project in Horsham take?+
For a standard Horsham residential job — kitchen floor plus a wet-room — figure 8–12 working days on site including surface prep, application and full seal. Whole-house schemes 3–5 weeks depending on square footage.
What's the price range for microcement in Horsham?+
Guide pricing across Horsham sits between £180–£320 per m² supplied and applied, depending on substrate condition, colour and sealer specification. Full quotes are always specific to the survey — we don't work off ballparks alone.
Projects across West Sussex typically stay in the same material family as Horsham. See our project gallery for recent finished work, filtered to the finish types most installed in the Horsham area.
The short version: Horsham projects are usually homeowner family and centre on 1930s detached. We survey free within the area, quote within 3 working days, and can typically start work 4–6 weeks later.
1735238704