For Brighton refurb clients, microcement staircases and risers sits at the intersection of two things they've usually already tried: the tile-and-grout route (grout-line fatigue) and full-slab stone (cost). microcement staircases and risers solves both — one continuous mineral surface at roughly a third of the stone-and-fixings price. The Brighton catchment we work across covers BN1, BN2 — reached via the A23 London Road, 5 min from our brighton workshop via the a23. Nearby coverage includes Hove (2 mi), Rottingdean (3 mi), Saltdean (4 mi). Site conditions matter here: salt-heavy coastal air demands UV-stable polyaspartic top-coats. That shapes the primer and sealer specification below, not just the visible finish.

What to watch for on quote comparison

  • Ignoring squeak — the crack line appears the first month.
  • Sharp 90° tread nose — chips on first use; radius 5 mm minimum.
  • Missing anti-slip broadcast on the nose — the sealer alone is a slip hazard.
  • Standard 3-coat sealer without floor-grade PU — wears through in a year on a busy stair.
  • Attempting a stair as a first-time DIY — the failure rate is close to 100%.

The spec sheet

Substrate prepTreads screwed and glued to eliminate squeak; edges arris-radiused 5 mm
ReinforcementFibreglass mesh at every tread-riser junction and stringer intersection
FinishReinforced base + 2× 1 mm colour + 3-coat polyurethane floor sealer
NosingAnti-slip aggregate broadcast into the sealer along the front 40 mm
Cure before use48 hrs light foot traffic; 7 days heavy use

What the finish sits on

A microcement staircase covers treads, risers and stringers in one continuous finish. The substrate must be squeak-free — moving timber under a rigid mineral finish is what causes crack lines at the nose. Screw-and-glue the treads and risers, dust off, then a proprietary bonding primer.

How to make it read as designed, not applied

A single-colour staircase from tread to stringer reads as sculpted rather than assembled. Contrast the wall paint 2 tones lighter than the microcement so the stair holds the eye. A brass or oak handrail against a warm-grey microcement stair is a signature detail.

Working in Brighton

Postcode coverage
BN1, BN2 — free surveys inside 5 working days. Nearest access: A23 London Road.
Local site character
Victorian sub-basements and converted seafront arches drive most resin briefs here. salt-heavy coastal air demands UV-stable polyaspartic top-coats.
Nearby coverage
Hove (2 mi), Rottingdean (3 mi), Saltdean (4 mi), Falmer (4 mi).

How the install actually runs

  1. Structural prepDay 1

    Timber staircase screw-and-glued; noses radiused; substrate dust-free and primed.

  2. Base and meshDay 2

    Reinforced base coat with fibreglass mesh at every junction.

  3. ColourDay 3–4

    Two 1 mm colour coats, hand-trowelled — the trickiest surface in the whole system to trowel evenly.

  4. Sealer + nosingDay 5–6

    3 coats floor-grade polyurethane; anti-slip aggregate broadcast on the nosing.

Brighton — frequently asked

The short version

Brighton staircases in one line: mineral finish, single continuous surface, hand-applied by our own team, £2,800–£6,500 per installation, 3–5 working days on site. Free survey with a written spec back inside 3 working days.