Microcement · Greater London

Microcement in Shoreditch

EC2A · E1 · E2 · A10 / A501 · 5 minutes from Liverpool Street via the A10

Overview

Microcement is a 2–3 mm mineral coating applied over prepared substrate — no grout lines, no tile joints, effectively seamless across floors, walls and wet-rooms. It's the most versatile finish in our catalogue. Our Shoreditch pipeline is anchored by industrial-conversion lofts with double-height living space, with additional work in the surrounding villages. We also see a steady share of Victorian terraced stock stretching across the postcode. A steady thread of hospitality work — the sealer specification is hospitality-grade, not domestic. Shoreditch sits on the A10 / A501, 5 minutes from liverpool street via the a10. From here we cover Hoxton (0.4 mi) and Clerkenwell (1 mi) and out to Spitalfields (0.5 mi) inside our standard service radius. The commercial fabric around the Shoreditch tech and hospitality quarter shapes a share of the local brief. Microcement floors are the workhorse of our specifications here. Warehouse conversions here typically want the raw-look microcement in Carbon or Concrete tones.

Property stock in Shoreditch
  • loft apartment
  • victorian terrace
Nearby areas we cover from Shoreditch
Hoxton
0.4 miles from Shoreditch
Spitalfields
0.5 miles from Shoreditch
Clerkenwell
1 miles from Shoreditch
Old Street
0.4 miles from Shoreditch
Who we work with here
  • designer led
  • hospitality
  • retail
How a Shoreditch project runs
  1. 1
    Site survey

    Free on-site visit within Shoreditch. We assess the substrate, take measurements, discuss finishes and confirm what's realistic.

  2. 2
    Sample & spec

    Sample board delivered — matched to your interior. Written specification and quote turned around within 3 working days.

  3. 3
    Programme

    Programme agreed with you (and your designer/architect if relevant). Typical Shoreditch start window is 4–6 weeks.

  4. 4
    Application

    On-site work delivered by our own trained applicators. Dust-sheeting, waste management and daily tidy included.

  5. 5
    Aftercare

    Handover pack with batch numbers and aftercare instructions. 10-year materials and workmanship warranty on qualifying installs.

Shoreditch — frequently asked
How long does a typical microcement project in Shoreditch take?+

For a standard Shoreditch residential job — kitchen floor plus a wet-room — figure 8–12 working days on site including surface prep, application and full seal. Whole-house schemes 3–5 weeks depending on square footage.

What's the price range for microcement in Shoreditch?+

Guide pricing across Shoreditch sits between £180–£320 per m² supplied and applied, depending on substrate condition, colour and sealer specification. Full quotes are always specific to the survey — we don't work off ballparks alone.

Finishes we most often install in Shoreditch
  • microcement floor
  • microcement kitchen
  • venetian plaster
Recent work nearby

Projects across Greater London typically stay in the same material family as Shoreditch. See our project gallery for recent finished work, filtered to the finish types most installed in the Shoreditch area.

We survey Shoreditch projects within 5 working days of enquiry.

Why Shoreditch clients choose us
  • Own-team applicators — no subcontractors on your job.
  • 10-year materials + workmanship warranty on qualifying installs.
  • Direct-line to a senior applicator throughout the programme.
  • Free Shoreditch site surveys within 5 working days.
Service radius from Shoreditch

We cover Shoreditch and all surrounding areas within a practical service radius, including Hoxton (0.4 mi), Spitalfields (0.5 mi), Clerkenwell (1 mi), Old Street (0.4 mi). Larger projects sit us on-site for the duration rather than commuting daily.

Commercial zone: Shoreditch tech and hospitality quarter.

The short version

The short version: Shoreditch projects are usually designer led and centre on loft apartment. We survey free within the area, quote within 3 working days, and can typically start work 4–6 weeks later.