Microcement in Winchester
SO23 · SO22 · A34 / M3 J9 · 1 hour 15 minutes from London via the M3
Microcement is a 2–3 mm mineral coating applied over prepared substrate — no grout lines, no tile joints, effectively seamless across floors, walls and wet-rooms. It's the most versatile finish in our catalogue. undefined Microcement wet-rooms and bathrooms come through regularly.
- homeowner family
- designer led
- 1Site survey
Free on-site visit within Winchester. We assess the substrate, take measurements, discuss finishes and confirm what's realistic.
- 2Sample & spec
Sample board delivered — matched to your interior. Written specification and quote turned around within 3 working days.
- 3Programme
Programme agreed with you (and your designer/architect if relevant). Typical Winchester start window is 4–6 weeks.
- 4Application
On-site work delivered by our own trained applicators. Dust-sheeting, waste management and daily tidy included.
- 5Aftercare
Handover pack with batch numbers and aftercare instructions. 10-year materials and workmanship warranty on qualifying installs.
- → limewash heritage
- → microcement bathroom
- → high end paint
Projects across Hampshire typically stay in the same material family as Winchester. See our project gallery for recent finished work, filtered to the finish types most installed in the Winchester area.
- Own-team applicators — no subcontractors on your job.
- 10-year materials + workmanship warranty on qualifying installs.
- Direct-line to a senior applicator throughout the programme.
- Free Winchester site surveys within 5 working days.
We cover Winchester and all surrounding areas within a practical service radius, including Alresford (6.5 mi), Twyford (3 mi), Kings Worthy (2.5 mi). Larger projects sit us on-site for the duration rather than commuting daily.
How long does a typical microcement project in Winchester take?+
For a standard Winchester residential job — kitchen floor plus a wet-room — figure 8–12 working days on site including surface prep, application and full seal. Whole-house schemes 3–5 weeks depending on square footage.
What's the price range for microcement in Winchester?+
Guide pricing across Winchester sits between £180–£320 per m² supplied and applied, depending on substrate condition, colour and sealer specification. Full quotes are always specific to the survey — we don't work off ballparks alone.
- period townhouse
- listed farmhouse
- edwardian villa
Free site survey within Winchester. Most quotes returned in 3 working days.
The short version: Winchester projects are usually homeowner family and centre on period townhouse. We survey free within the area, quote within 3 working days, and can typically start work 4–6 weeks later.
2645485051