Wet area specification

Microcement In Bathrooms And Wet Rooms

A microcement bathroom lives or dies on what happens below the finish. Get the tanking, falls and junction details right and the room is genuinely seamless. Get them wrong and the surface becomes the visible symptom of a hidden problem.

The waterproofing is not the microcement

This is the single most misunderstood point in wet room specification. Microcement sealers repel water at the surface, but the waterproof layer is a separate tanking membrane installed underneath the finish. In a shower enclosure and across any wet zone, that membrane and its bonded corner tapes are what keep water out of the structure.

When a wet room fails it is almost never the coating that let go. It is a membrane that stopped short of the splash zone, a pipe penetration that was never collared, or a movement junction between two different substrates that was bridged rigidly. Ask any contractor to show you the tanking system by name and where its coverage starts and stops.

Tanking
Bonded membrane with taped internal corners, below the finish
Shower falls
Formed in the substrate or a proprietary former, not in the coating
Finish depth
Around 2 to 3 mm over the membrane
Sealer
Multi-coat schedule rated for continuous wet exposure

Build-up sequence in a typical wet room

  1. 1
    Strip and assess

    Existing tiles, boards or vinyl come off or are tested for bond. The condition of what is behind determines everything that follows.

  2. 2
    Board and form

    Tile backer boards, a shower former with the correct fall to the drain, and any bench or niche geometry are set out and fixed.

  3. 3
    Tank

    Membrane applied across the wet zone, with tapes into every internal corner, around the drain flange and at pipe penetrations.

  4. 4
    Prime and mesh

    A bonding primer goes down, followed by base coats with reinforcing mesh across board joints and change-of-substrate lines.

  5. 5
    Finish and seal

    Fine finish coats are trowelled, cut back, then a multi-coat sealer schedule is applied with the correct interval between coats.

Details that decide the outcome

Drains, thresholds and glass fixings are where a seamless room stops being seamless. A linear drain set flush with the finished level is far more forgiving than a point drain in a small enclosure, because it needs a fall in one direction rather than four. Glass screens that are drilled through the finish after sealing need the fixing holes sealing properly, and that step is regularly missed.

Sanitaryware sequencing matters too. Wall-hung units, concealed frames and pipe runs need to be in position before the finish goes on, because any drilling afterwards breaks the sealer film. On a design-led scheme the coordination between the plumber, the glazier and the applicator is worth more attention than the colour choice.

  • Linear drain preferred over a point drain in small enclosures
  • Concealed cistern frames fixed and tested before the finish is applied
  • Fixing penetrations sealed individually, not just wiped over
  • Junctions between board and masonry meshed rather than butted

Living with the finished room

A sealed microcement bathroom cleans with warm water and a pH-neutral product. What shortens its life is the household chemistry cupboard: limescale removers, bleach-based sprays and abrasive creams all attack the sealer film rather than the cement beneath, and once the film dulls, water starts sitting on the surface instead of beading off.

In hard water areas, drying the shower walls after use makes a visible difference to how long the surface holds its sheen. Sealers are consumable and can be refreshed. That is a maintenance item, not a defect, and it is worth building into a client handover pack on any development.

Wet room questions worth asking

Before you sign off a wet room spec

Ask for the tanking system, the drain type, the fall arrangement and the sealer schedule in writing. If those four things are clear, the finish will look after itself. Send us your bathroom drawings and we will mark up where the risk sits.